You're offline — entries will be saved and sent automatically once you're back online.
UA Daily Record
Enter your Worker ID to start logging today's work.
Worker ID
Continue
UA Daily Record
My entries
Switch
New Entry
Form
NLT
SPPG
Team
Team 1
Team 2
Team 3
Date
Location & Scheme
▶
Location
Scheme No
No of Way
MH to MH
Completed Work Details
▶
Pipe Laying — Way × M
Trial Hole — L × W (m²)
MH Cover (pcs)
Pipe Block (spot)
Draw Pits — L × W (m²)
Steel Plate Installation — L × W (m²)
Reinstatement — L × W (m²)
Reinstatement Type
Soil (S)
Footpath (F)
Premix (P)
Crossing (C)
Usage & Balance Materials
▶
Dumping (load)
Q Dust (load)
RCA (load)
Soil (load)
Premix (ton)
Rental Lorry
Jumbo Bag (pcs)
Rope (m)
Cement (bag)
Sand Bag (pcs)
Diesel (L)
Slabs (pcs)
Job Description
▶
Seal Keyhole (mh)
Boring MH Wall (pcs)
Bend — Size × Pcs
Spacer — Size × Pcs
Water Tanker (no)
TMA (no)
Casual Labour — Man × Hr
New MH — Size × Quantity
APO/ASO — Pax × Hr
Slabs (m)
Pipe Materials
▶
P150 — 6m Pipe (pcs) / Pipe (m)
P110 — 6m Pipe (pcs) / Pipe (m)
P50 — 6m Pipe (pcs) / Pipe (m)
Photo, Location & Remarks
▶
Site Photo
GPS Location
Capture location
Not captured
Remarks
Submit Entry
← Back to new entry